Pictures from the site

Check out the latest pics from the construction site!

We had a very successful floor-slab concrete-casting day today. The pictures mostly speak for themselves, but I'll explain a bit.
Here is how the mixing is done. Yes, it is as back-breaking as it looks.


This is mostly a slab-on-grade floor with a small portion that is a concrete lid for a mini septic tank. In this picture you can see opening where a manhole cover will go. To the right of that are two empty cement bags, filled with mud, that are place-holders for the "squatty potties" (low to the ground porcelain toilet bowls) that will be placed in them later. Once this concrete has cured, we will pull out the mud and paper bags to prepare the opening for the toilet bowl.


This is a segment of a banana tree trunk that has become a place-holder for a shower floor drain. When we prepare to place the finish floor, we'll set the floor drain in mortar. This clever use of the banana trunk was our foreman Fred's idea.


And here's a group shot. The gentleman in the middle of the back row with the white and brown shirt is our foreman Fred, with whom I have worked very closely. The white guy in the front row is Danny, an EMI intern from Alabama who is helping us out. This entire crew has been very fun to work with.